Match vendors to assets and likely service needs
List the trades and specialist equipment at the property, including the contractor already maintaining each critical system. Record service boundaries, normal hours, emergency contact arrangements and access needs. Confirm that a telephone number reaches the right service function.
Identify qualified backup providers for important systems where possible and ask about their ability to work on the installed equipment. A backup name is not an agreed response guarantee. Check whether warranties, proprietary controls or existing agreements affect who can perform the work.
Keep qualification and commercial terms current
Use a vendor file containing the correct legal name, relevant trade credentials, insurance evidence, scope and pricing terms. For construction subject to WSIB clearance rules, track valid clearance before and throughout the work. Coverage and clearance should not be labelled as commercial general liability insurance.
With the reference’s permission, check recent work at comparable properties. Ask about the actual scope, site constraints, documentation and how defects were resolved. The commercial contractor-vetting guide sets out the evidence to compare. A small initial assignment may help assess delivery, but it does not replace the credentials required for the work.
Check applicable qualifications when the work changes; a contractor accepted for one service may not be qualified for another. Review unclear documentation before issuing the new order. For hired electrical work, verify the appropriate ESA contractor licence.
Agree how call-outs, travel, materials, disposal, overtime and subcontractors are charged. A disclosed materials markup can be a legitimate contract term; the issue is whether the price basis is clear and approved. Compare quotations using the same scope and access assumptions.
Evaluate delivered work and prepare for transition
Track acknowledgement and arrival separately from repair completion. Review recurring defects, documentation quality, invoice accuracy and tenant disruption using dated examples. Account for approved scope changes and parts delays so a performance review does not reward superficial fast closure.
Use renewals to discuss upcoming work, capacity and observed problems. Check document expiry dates as they occur instead of waiting for an annual meeting. A respectful review can improve coordination but cannot ensure a vendor will always prioritize the property.
When replacing a provider, arrange work-order history, open defects, asset records and controlled transfer of keys or credentials. Confirm who covers urgent calls during the transition. Continuity depends on a completed handover, not simply signing the next contract.
Technical references
- WSIB: Clearance questions and answers — Construction clearance before and throughout the assignment.
- ESA: Electrical contractor licensing — ESA licensing for electrical contracting.
Sources & References
- Ontario Building Code — Relevant Standards & Guidelines
Include a preferred date and time
Send a commercial maintenance request
Describe the work area, site access and any operating hours the work must accommodate.
Prefer to send the details first? Request a quote or call (519) 501-5003.